Address check
After your order, we verify network availability and technical options at your address.
We are preparing a next-generation optical network for Svidník. This page shows the current status and expected launch date.
Final availability and installation method are always verified for the exact address and technical conditions.
The packages shown match the technologies recorded for this location. We will confirm availability after checking your address.
After your order, we verify network availability and technical options at your address.
Our technician agrees a suitable date and connection route with you.
We install, test and hand over the connection ready to use.
The marker shows the centre of the location. Service availability is verified for the exact address.
The network status is currently “Under construction”. The expected date is 09/2026.
The offering depends on the technology available at your address. Current packages and speeds are listed above.
Timing depends on technical conditions and technician capacity. After checking the address, we will contact you to agree the exact process.
Follow the current coverage status. Orders will open after the network is completed and launched.